0%
Loading the arithmetic
byHoratio/Tools/10 · Quotes to target

How many quotes a day does your target need? And can you actually do them.

The reverse pipeline is simple arithmetic and every owner has done it on a napkin. This version adds one more line: minutes per quote times quotes per day, against the quoting hours the team has. It tells you when the target is not ambitious but arithmetically impossible under the current method — and what the ceiling is.

Tool10 · Quotes to target
InputsEight, from your plan and your diary
OutputQuotes a day, hours a day, the ceiling
Proven inCase study 004
CostFree · nothing stored
Jobs target ÷ order valueQuotes jobs ÷ win ratePer day ÷ working daysHours a day × minutes per quoteCapacity people × hoursCeiling the target you can actually reach Jobs target ÷ order valueQuotes jobs ÷ win ratePer day ÷ working daysHours a day × minutes per quoteCapacity people × hoursCeiling the target you can actually reach

Target divided by order value is jobs. Jobs divided by win rate is quotes. Quotes divided by working days is what you have to send every day. Owners do this on a napkin and it is right — but it stops one line short. Multiply quotes a day by minutes per quote and compare it with the hours the team can actually quote, and some targets turn out not to be ambitious but impossible.

Quotes a day the target needs

Your plan · eight numbers

The target
£
£
%
Your quoting capacity

The reverse pipeline · per day

—quotes a day, every working day, to hit the target
Jobs needed a year
Quotes needed a year
Quotes a day
Hours of quoting a day, today's method
Hours a day the team actually has
Revenue ceiling under today's method
Hours a day the target needs from a system
Quotes a day the target needs
Book a 20-minute call →
Defaults use the quoting figures from case study 004. Use last year's win rate and average order, and time the minutes per quote rather than guessing. Nothing you type is stored.

What the number means

  • A £1.5m target at £1,500 an order and a 25% win rate needs 1,000 jobs, 4,000 quotes, 16 a day. At fifteen minutes each that is four hours of quoting a day against six available. Possible.
  • A £3m target needs 32 a day and eight hours against six. Not ambitious — impossible, under the current method, however hard anyone works.
  • The ceiling under today's method is the hours available, converted back into revenue: at the defaults about £2.25m. Above that the plan is fiction until the minutes per quote change.
  • From a system at three minutes a quote, the £3m target needs 1.6 hours a day. That is what the nursery in case study 004 did: 15–20 leads a day, all quoted, same day, same three people.

How is quotes-to-target calculated?

The reverse pipeline is three divisions. Revenue target divided by average order value gives the jobs you need to win. Jobs divided by win rate gives the quotes you need to send, because you do not win them all. Quotes divided by working days gives the number that has to go out every day. That is where most calculators stop, and it is useful as far as it goes.

The fourth line is capacity. Quotes a day times minutes per quote is the hours of quoting the target needs every day. People who quote times the hours each can honestly spend quoting — between calls, orders and everything else — is the hours available. When the first is bigger than the second, the target cannot be reached by effort, only by changing the minutes. The tool then runs the arithmetic backwards to give the ceiling: the most revenue the current method can produce with the hours it has.

Why is this a diagnosis, not a pep talk?

Because it is exactly the peak-season arithmetic that broke the wholesale nursery before the rebuild. In the busy season the sales team could take fifteen to twenty leads a day. At fifteen minutes a quote that is nearly five hours of pure quoting before anyone answers a telephone — so under the old method they simply could not quote them all and take calls in the same day, and some proportion of those leads never got a quote at all, in exactly the weeks the business was most likely to win them.

At two to three minutes it is under an hour. The same three people now quote every peak-day lead the same day, and the business went from £1m to £3.2m with the office unchanged. The target did not get easier. The minutes got shorter.

8 hrs vs 6of quoting a day for a £3m target at fifteen minutes a quote. At three minutes, 1.6 hours. Same team, same target.

A worked example

A £1.5m target, £1,500 average, 25% win rate, 250 days: 1,000 jobs, 4,000 quotes, 16 a day. At fifteen minutes that is four hours of quoting a day; two people with three hours each have six. Fine. Double the target to £3m: 32 a day, eight hours, against the same six — impossible. The ceiling under today's method is six hours × four quotes an hour × 250 days × 25% × £1,500 = £2.25m. From a system at three minutes, the £3m target needs 1.6 hours a day.

What does the number leave out?

  • Enquiry supply. The tool assumes the enquiries exist to be quoted. If they do not, that is a marketing problem, not a quoting one.
  • Seasonality. Quotes per day is an annual average; the peak day is worse. The cost of standing still models the peak separately.
  • Speed. Even when the hours fit, a quote sent three days late converts worse than one sent on the call. The quote response time calculator has that.
  • Fulfilment. Winning 2,000 jobs is only useful if the business can deliver them, which is the next bottleneck after quoting and the reason the nursery worked downstream through fulfilment after the front of the chain was fixed.

What do you do with the number?

Put next year's target in, not this year's. If the warning shows, the sales plan depends on a quoting method that cannot deliver it, and the fix is the minutes per quote — the price book in a system so a quote is built from a catalogue on the call rather than from a spreadsheet afterwards. The operations audit starts there for any business that quotes, the other calculators cover the hire and the hours beside it, and the short version of the method is on the byHoratio homepage.

Questions people ask about quotes and targets

How many quotes do I need to hit my revenue target?

Target divided by average order value gives jobs; jobs divided by win rate gives quotes; quotes divided by working days gives what has to go out every day. A £1.5m target at £1,500 an order and a 25 per cent win rate over 250 days is 1,000 jobs, 4,000 quotes and 16 a day. Then check the fourth line: 16 quotes at 15 minutes is four hours of quoting a day, which the team has to actually have.

What if the hours needed are more than the hours we have?

Then the target is not reachable under the current method, regardless of effort. You have two levers. Hiring another quoter adds one person's hours at the same minutes per quote, so it raises the ceiling by a fixed step and brings on-costs with it. Cutting the minutes per quote — quoting from a catalogue in a system rather than from a spreadsheet — raises the ceiling for everyone at once, which is what took the nursery in case study 004 from unquotable peak days to quoting every lead the same day.

What is a realistic number of quoting hours per person per day?

Fewer than the working day. Between calls, orders already sold, customers on the phone and everything else, three hours of actual quoting a day is honest for most salespeople; some days it is one. Use the figure you would defend, not the one you would like, because an optimistic capacity hides the impossibility the tool exists to reveal.

Why does the calculator show a revenue ceiling?

Because it is the number that stops the argument. The ceiling is the hours available converted back into revenue through minutes per quote, win rate and order value — the most the current method can produce. If next year's target is above it, the quoting method has to change before the sales plan can, and no amount of motivation alters that.

Should I use last year's win rate or the one I want?

Last year's. The point of the reverse pipeline is to find out what the plan requires of the business, and a win rate you hope for hides the requirement. If you want to see what an improved win rate would do, change it after — and note that faster quoting improves it, which the quote response time calculator shows.

—One next step

Is the target ambitious, or impossible?

If the quoting hours don't fit in the day, no sales plan survives contact with it. Change the minutes per quote first. Twenty minutes, no deck, no pitch.

HORATIO@BYHORATIO.COM

Book a 20-minute call →